Perancangan Ekonomis dan Teknis Pembangkit Listrik Tenaga Surya di SD Bintang Juara Semarang
DOI:
https://doi.org/10.59059/mutiara.v3i1.2059Abstract
Indonesia's geographical position along the equator provides immense potential for renewable energy development, particularly solar power. Semarang, a city with high solar irradiance, is an ideal location for implementing solar energy solutions. SD Bintang Juara, situated at Jalan Dewi Sartika No. 17A, exhibits promising potential for an on-grid solar power plant (PLTS) due to its average solar radiation intensity of 5.4 kWh/m²/day. The school's energy demand of 67.045 kWh daily incurs a monthly electricity cost of Rp 2,600,000.00, which can be substantially reduced by offsetting 50% of the load with solar energy. This study employs a quantitative approach, analyzing solar radiation data, building orientation, and energy load to design a cost-effective and technically sound PLTS system. Findings reveal both technical and economic feasibility, with projected electricity production supporting a significant portion of the school’s needs. Over a 15-year operational period, the PLTS system is estimated to generate a total revenue of Rp 64,151,108.00. This initiative highlights the potential for renewable energy to reduce costs and promote sustainability in educational institutions, paving the way for broader applications across similar contexts.
References
Ariyani, S., Wicaksono, D. A., Fitriana, & Taufik, R. & Gemenio. (2021). Studi Perencanaan dan Monitoring sistem pembangkit listrik tenaga surya di Remote Area. Program Studi Teknik Elektro, Universitas Muhammadiyah Jember, Jember.
Aprilia, B. S., Silalahi, D. K., & Rigoursyah, M. A. F. (2019). Desain Sistem Panel Surya On-Grid untuk skala rumah tangga menggunakan perangkat lunak homer. Fakultas Teknik Elektro Universitas Telkom Bandung, Bandung.
Arinata, R. P., & Akram, T. H. (2024). Analisis Pengembangan PLTS di Pulau Takabonerate. Teknik Elektro Universitas Muhammadiyah Makassar, Makassar.
Hiswandi, M. F., Iswahyudi, F., & Soeroto, W. M. (2023). Analisis Kelayakan investasi pembangkit listrik tenaga surya atap dengan sistem on-grid di pabrik minuman siap saji. Surabaya.
Kariongan, Y., & Joni. (2022). Perancangan dan Analisis ekonomi pembangkit listrik tenaga surya rooftop dengan sistem on-grid sebagai catu daya tambahan pada RSUD Kabupaten Mimika. Fakultas Teknik Universitas Cenderawasih, 2022.
Lubis, K., Zambak, M. F., & Faisal, A. (2023). Rancang Bangun Pembangkit Listrik Tenaga Surya (PLTS) pada Laboratorium Teknik UMSU menggunakan simulasi PVSyst.
Megantoro, P., Syahbani, M. A., Sukmawan, I. H., Perkasa, S. D., & Vigneshwaran, P. (2022). Effect of Peak Sun Hour on Energy Productivity of solar photovoltaic power system.
Ramadhana, R. R., M., I. M., Hafid, A., & Adriani. (2022). Analisis PLTS On-grid.
Sukmajati, S., & Hafidz, M. (n.d.). Perancangan dan analisis pembangkit listrik tenaga surya kapasitas 10 MW on-grid di Yogyakarta. [Online].
Wibowo, R. S., Panangsang, O., Aryani, N. K., Mukti, P. H., Pamuji, F. A., & Mardiyanto, R. (2023). Implementasi Photovoltaic On-Grid guna Meminimalisir pemadaman listrik bergilir serta jaringan telekomunikasi di Pulau Bawean. Departemen Teknik Elektro Institut Teknologi Sepuluh November Surabaya, Surabaya.
Tokopedia. (n.d.). POWMR 10.2KW On-Off Grid Hybrid Inverter 48VDC 160A Solar Controller. Retrieved from https://www.tokopedia.com/artstor/powmr-10-2kw-on-off-grid-hybrid-inverter-48vdc-160a-solar-controller.
Alibaba. (n.d.). MERITSUN Solar Inverter. Retrieved from https://indonesian.alibaba.com/p-detail/MERITSUN-1600267270298.html?spm=a2700.pccps_detail.0.0.191113a0E956HQ&s=p.
Power LARC. (n.d.). Data Access Viewer. Retrieved from https://power.larc.nasa.gov/data-access-viewer/.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Mutiara : Jurnal Penelitian dan Karya Ilmiah
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.